A residential scheme needed new foul and storm drainage and a SUDS attenuation tank to meet a planning condition.
The work we did
We excavated and laid twin drainage runs, built inspection chambers with pea gravel bedding and installed geocellular attenuation crates wrapped in geotextile.
The outcome
Drainage tested and signed off, with installation records supplied for the planning condition. (Placeholder text: replace with the real project story.)